Project Details:

Owner: Gestamp US HARDTECH

Location: Mason, MI

Project Summary:

Construction of a new 130,000 sq. ft. addition with a 28,000 sq. ft. by 18 ft. deep basement on a 68 acre site, and a new 30 mega-watt sub-station. The overall building height was 64 ft. with the interior bottom cord of truss at 54 ft. The addition was adjacent to an existing operations facility and was constructed for 2 new stamping lines, hot forming oven and other miscellaneous manufacturing equipment.

Over 650 personnel were processed through site safety orientation. 250,000 man-hours executed, with no loss of time injuries. Project execution was an aggressive 10 month build schedule.